This product is suitable for various environments, including multi-story buildings, airports, and power plants, and is available in customizable housings and materials like steel, stainless steel, and aluminum alloys. It also features a temperature control display and load recorder for user convenience and operational stability.
Load properties
1) When there are a large number of primary or secondary loads, it is recommended to install two or more transformers. When any one of the transformers is disconnected, the capacity of the remaining transformers can meet the power consumption of the primary and secondary loads. The primary and secondary loads should be concentrated as much as possible and should not be too scattered.
2) When the seasonal load capacity is large, a dedicated transformer should be installed. Such as the load of air-conditioning refrigerators and electric heating loads in large civil buildings.
3) When the centralized load is large, a dedicated transformer should be installed. Such as large heating equipment, large X-ray machines, arc furnaces, etc.
4) When the lighting load is large or the use of a shared transformer for power and lighting seriously affects the lighting quality and bulb life, a dedicated transformer for lighting can be installed. Normally, power and lighting share a transformer.
![Single Phase Oil Immersed Power Transformer 1000kva Single Phase Oil Immersed Power Transformer 1000kva]()
Electricity load
1) The capacity of the distribution transformer should be calculated based on the facility capacity of various electrical equipment (generally excluding fire protection load). The compensated apparent capacity is the basis for selecting the capacity and number of transformers. Generally, the load factor of the transformer is about 85%. This method is relatively simple and can be used to estimate capacity.
2) In GB/T17468-1998 "Guidelines for Selection of Power Transformers", it is recommended that the capacity selection of distribution transformers should be based on GB/T15164-94 "Guidelines for Loading of Oil-immersed Power Transformers" or GB/T17211-1998 "Dry Type Power Transformer Loading Guidelines" and calculate the load to determine its capacity. The above two guidelines provide computer programs and normal cycle load diagrams to determine distribution transformer sizing.
![Single Phase Oil Immersed Power Transformer 1000kva Single Phase Oil Immersed Power Transformer 1000kva]()
Industry-Specific Attributes
Use | Power |
Phase | Single |
Coil Structure | TOROIDAL |
Coil Number | AUTOTRANSFORMER |
Other Attributes
Place of Origin | Shandong, China |
Brand Name | Jinshida |
Model Number | SCB11-30~1600/,S11-30~1600/,S11-30~20000/35 |
Product name | Oil Immersed Power Transformer |
Frequency | 50Hz/60Hz |
Rated capacity | 400kVA |
Standard | ISO9001: 2008 |
Name | Oil Immersed Distribusion Transformer |
Rated voltage | 22KV |
Warranty | 24 Months |
Cooling Method | ONAN |
Capacity | 400kva |
Transformer type | S11 Oil-immersed Transformer |
Packaging and Delivery
Selling Units |
Single item |
Single package size |
1260X820X1240 cm |
Single gross weight |
50.000 kg |
10 Rated Power (kVA) | High Voltage (kv) | Low Voltage (kv) | Connection symbol | No-load loss(W) | On-load loss(W) | No load current (%) |
30KVA | 6.3KV 15KV 22KV 25KV 33KV 10KV 11KV 20KV 35KV | 0.4 | Ydn11 Yyno | 570 | 4300 | 0.4 |
50KVA |
80KVA | 680 | 5140 | 0.45 |
100KVA |
125KVA | 810 | 30800 | 0.4 |
160KVA |
200KVA | 980 | 7500 | 0.4 |
250KVA |
315KVA | 1150 | 10300 | 0.35 |
400KVA |
500KVA | 1360 | 12000 | 0.3 |
630KVA |
800KVA | 1640 | 145000 | 0.6 |
1000KVA |
1250KAV | 1950 | 19140 | 0.6 |
1600KVA |
2000KVA | 2340 | 22220 | 0.5 |
2500KAV |
Customized Various Models
![various models various models]()
![various models various models]()
Product Process
![product process product process]()
Application
Our products can be used in the power industry, mining industry, aviation industry, petroleum industry, bridge engineering, etc.
![application application]()
Certificate
![certificate certificate]()
Packing and Delivery
![packing and delivery packing and delivery]()
About Us
China's JinShiDa has 21 years of experience in international power projects, helping many customers around the world to complete power projects. For example, Canada.Mexico, Panama, Ecuador, Guatemala, Honduras, Chile, El Salvador, Australia, New Zealand, Spain, Belgium, Algeria, South Africa, Ethiopia, Myanmar, Kazakhstan, etc.Kingstar also has a very good after-sales installation service team abroad, so if you have transformer needs, you can contact us.
![Company Profile Company Profile]()
Our Advantages
1.Quality Assurance
Jinshida follows the standard of customer demand, providing technical support and full quality control supervision to ensure that our products have excellent quality and reliability.
2.After-sales guarantee
Jinshida provides global customers with worry-free after-sales service, at three-year warranty period to allow customers to enjoy long-term stability of performance, to ensure that customers in the process of use can be satisfied with the experience.
3.Delivery time guarantee
Jinshida strictly adheres to the contractual delivery date to ensure that customers can receive the required products on time.
![jsd jsd]()