Oil Transformer Three-Phase

The operation and maintenance of transformers mainly includes four aspects: basic requirements, equipment switching operation, inspection and accident handling.

(1) Basic requirements: High-voltage maintenance personnel must hold a certificate to work, and those without a certificate are not authorized to operate.

(2) Transformer switching operation sequence: During power outage, the load side is stopped first, then the power side; when power is transmitted, the above operation sequence is reversed.

(3) Inspection and inspection: According to the requirements of the substation safety operation regulations, in addition to the inspection and inspection required during shift handover, the operating personnel on duty should inspect the substation 5 times per shift. The inspection items are as follows.



Product Details

The operation and maintenance of transformers mainly includes four aspects: basic requirements, equipment switching operation, inspection and accident handling.

(1) Basic requirements

1) High-voltage maintenance personnel must hold a certificate to work, and those without a certificate are not authorized to operate.

2) When power outage is required for maintenance, it should be reported to the competent department for approval and the user should be notified before proceeding.

3) The insulating oil of outdoor oil-immersed transformers should be tested once a year, and the insulating oil of indoor oil-immersed transformers should be tested every two years.

(2) Transformer switching operation sequence: During power outage, the load side is stopped first, then the power side; when power is transmitted, the above operation sequence is reversed.

1) Power is transmitted from the power source side to the load side step by step. If there is a fault, it is easy to determine the scope of the fault and make timely judgment and processing to avoid the spread of the fault.

2) In the case of multiple power supplies, stopping the load side first can prevent reverse charging of the transformer. If the power supply side is stopped first, the protection device may malfunction if there is a fault.

(3) Inspection and inspection: According to the requirements of the substation safety operation regulations, in addition to the inspection and inspection required during shift handover, the operating personnel on duty should inspect the substation 5 times per shift. The inspection items are as follows.


Oil transformer three-phase

Industry-Specific Attributes


UsePower
PhaseThree
Coil StructureTOROIDAL
Coil NumberAUTOTRANSFORMER




Other Attributes


Place of OriginShandong, China
Brand NameJinshida
Model NumberSCB11-30~1600/,S11-30~1600/
Input Voltage10kv
Product nameThree Phase Transformer
Rated capacity400kVA
Frequency50Hz/60Hz
StandardISO9001: 2008
NameHigh Fequency Transformer
Rated voltage22KV
Warranty24 Months
Cooling MethodONAN
Capacity400kva



Packaging and Delivery

Selling Units


Single item


Single package size


1260X820X1240 cm


Single gross weight


50.000 kg


Product Paramenters

10 Rated Power (kVA)

High Voltage (kv)

Low Voltage (kv)

Connection symbol

No-load loss(W)

On-load loss(W)

No load current (%)

30KVA

6.3KV

15KV

22KV

25KV

33KV

10KV

11KV

20KV

35KV

 

0.4

Ydn11

Yyno

570

4300

0.4

50KVA

80KVA

680

5140

0.45

100KVA

125KVA

810

30800

0.4

160KVA

200KVA

980

7500

0.4

250KVA

315KVA

1150

10300

0.35

400KVA

500KVA

1360

12000

0.3

630KVA

800KVA

1640

145000

0.6

1000KVA

1250KAV

1950

19140

0.6

1600KVA

2000KVA

2340

22220

0.5

2500KAV



Customized Various Models


Customized Various Models



Product Process


product process

Product Accessories


product accessories


Application

Our products can be used in various industries such as power industry, urban construction, ports, etc.


Application


Certificate


certificate


Packing and Delivery


packing and delivery


Company Profile





jsd


Leave your messages

Related Products

x

Popular products

x
x